Dulux Testing Laboratory Facility

Plumbing, Mechanical, and Electrical Services for Testing Lab Workshop. Delivered on time and on budget.

Project Overview


Client: Dulux - New Zealand's leading paint and coatings manufacturer

Facility: State-of-the-art testing laboratory facility designed for precision analysis of paint formulations and quality control processes

Location: Auckland, New Zealand

Building Type: Specialised industrial laboratory (2,500m²)

Sector: Manufacturing - Chemical/Paint Industry

Project Impact

CBS completed the plumbing, mechanical, and electrical installations for the new testing lab at Dulux.

The Challenge


Dulux required a highly specialised testing environment where precise temperature, humidity, and air quality controls were essential for accurate paint analysis and quality assurance.

Key Challenges:

  • Precision Environmental Controls: Laboratory testing required temperature stability within ±0.5°C and humidity control within ±2%

  • Chemical Compatibility: HVAC systems needed to handle potential chemical vapors and maintain air quality standards

  • Regulatory Compliance: Facility had to meet strict industrial laboratory standards and building consent requirements

  • Tight Timeline: Project completion was critical to Dulux's product development schedule

  • Operational Continuity: Installation had to occur without disrupting existing operations at nearby facilities

  • Future Flexibility: Systems needed to accommodate potential laboratory expansion and changing testing requirements

Our Solution


Comprehensive System Design & Installation:

  • Custom-designed climate control with redundant systems for critical areas

  • Multi-stage filtration system to handle chemical vapors and maintain laboratory air quality

  • Smart controls allowing real-time monitoring and adjustment of all environmental parameters

  • Coordinated mechanical, electrical, and plumbing installation managed as single projectItem description

  • End-to-end compliance management from design through commissioning

Measurable Outcomes:

Project Completed On Time And On Budget

±0.3°C Temperature Stability - Exceeded specification requirements

Zero System Downtime - In the first 18 months of operation

30% Faster Testing Cycles - Due to stable environmental conditions

CBS's integrated approach meant Dulux had a single point of contact for all building services, streamlining project management and ensuring seamless system integration.

  • "CBS delivered exactly what they promised, when they promised it. The precision of their work means our testing environment is absolutely reliable. We can now conduct more accurate testing faster than ever before, which directly impacts our product development timeline. Their understanding of our technical requirements and regulatory compliance needs was exceptional."

    - Mark Thompson, Facilities Manager, Dulux New Zealand

Ready to Discuss Your Specialised Project?


Whether you need precision environmental controls, complex MEP integration, or specialized building compliance, CBS has the expertise to deliver exceptional results for your unique requirements.

Call us: 0800 377 344 | Email: Projects@cbsservices.co.nz