BMS Upgrade

Building 8 previously utilised an outdated BMS system. Upon CBS assuming the building contract, we were tasked with investigating the building’s high-power consumption. Our investigation revealed that failed BMS points resulted in certain plant items running continuously, leading to excessive energy use. The front-end BMS computer offered limited visibility into the building’s operations. In response, CBS installed a new, cloud based BMS system, reducing power consumption and providing the capability to remotely access and monitor building operations from any location.

CBS maintains 12 buildings within Central Park, a large commercial business park located in Ellerslie/Greenlane, Auckland.