dulux test lab facility.
Plumbing, Mechanical, and Electrical Services for Testing Lab Workshop
CBS completed the plumbing, mechanical, and electrical installations for the new testing lab at Dulux. The lab features a heat recovery system that uses stale Extract air to temper incoming fresh air. A hybrid VRF system was installed to provide climate control for both he office and lab areas, ensuring the specified temperature. A climate control room where temperature and humidity levels are maintained to a desired Setpoint. Additionally, a paint booth and fume cupboards were installed and commissioned. The BMS system was integrated to control all mechanical plant operations. Plumbing works included the installation of cold and hot water systems throughout the site, as well as the installation of hot water cylinders. Pneumatic pipes and an air compressor system were also installed and commissioned.
BMS Switchboard
Climate control lab
Duct work and FCU
Duct work
Duct work
Fresh air